top of page

Lago Vista High School

Lago Vista, Texas
Lago Vista High School

Services: Structural Engineering

Cost: $29M

Date Complete: February 2015

Team: Fromberg Associates Inc.

Owner: Lago Vista Independent School District

Description: This new high school was built to accommodate at least a 3A-sized number (700) of students.  It includes a two-story classroom building, a main building with a library, cafeteria, and a grand stair, a competition gymnasium and a practice gymnasium, a vocational shop, band hall, and a performing arts center.  The athletics facilities includes a fieldhouse that is carved 12 feet into the land, with a weight room, concessions, and roof deck that looks over the football fields.  The main structural framing systems of the buildings are structural steel and/or load-bearing CMU.

Lago Vista High School
LVHS PAC Print.jpg
bottom of page