top of page
Battleship Electrical Systems Improvement at Texas State Historic Site
Structural Engineering
This project included the installation of a new gen set on one of the upper decks at the Battleship. Tsen Engineering performed an analysis of the existing ship to verify the ship structure could support the weight of the gen set at its drop off location and its permanent location, and a fuel tank at its permanent location. We also verified that the gen set room could be modified to allow new openings for the gen set to be placed and for new intake and exhaust louvers.



1/1
COST
Unknown
LOCATION
La Porte, Texas
YEAR COMPLETED
2017
OWNER
Texas Parks and Wildlife Department
SECTOR
MEP Support, Historic
bottom of page