top of page

Lago Vista High School

Structural Engineering

This new high school was built to accommodate at least a 3A-sized number (700) of students. It includes a two-story classroom building, a main building with a library, cafeteria, and a grand stair, a competition gymnasium and a practice gymnasium, a vocational shop, band hall, and a performing arts center. The athletics facilities include a fieldhouse that is carved 12 feet into the land, with a weight room, concessions, and roof deck that looks over the football fields. The main structural framing systems of the buildings are structural steel and/or load-bearing CMU. Size: 110,000-sf

Lago Vista High School

COST

$29.6M

LOCATION

Lago Vista, Texas

YEAR COMPLETED

2014

OWNER

Lago Vista Independent School District

SECTOR

K-12

bottom of page