Town Lake Metro Park Seaholm Intake Facility Phase I

Structural Engineering

This project is the Phase 1 Renovation of the iconic 1950’s Seaholm Intake facility. This phase made the existing intake structure habitable for public use with seamless integration into the trail system as a future phase. The Seaholm Intake facility consists of (2) two-story concrete buildings that served as the pump house for the Seaholm Power Plant. A small CMU building is also on the site, that was built in the ~1980’s. The facility lies south of Cesar Chavez, along the Lady Bird Lake shoreline, within designated parkland. Seaholm Intake Facility Night Photo by Christina Bies.

Town Lake Metro Park Seaholm Intake Facility Phase I

COST

$2.5M

LOCATION

Austin, Texas

YEAR COMPLETED

2022

OWNER

City of Austin Parks and Recreation Department

SECTOR

Historical, Adaptive Reuse, Municipal