Services: Structural Engineering
Cost: $29M
Date Complete: February 2015
Team: Fromberg Associates Inc.
Owner: Lago Vista Independent School District
Description: This new high school was built to accommodate at least a 3A-sized number (700) of students. It includes a two-story classroom building, a main building with a library, cafeteria, and a grand stair, a competition gymnasium and a practice gymnasium, a vocational shop, band hall, and a performing arts center. The athletics facilities includes a fieldhouse that is carved 12 feet into the land, with a weight room, concessions, and roof deck that looks over the football fields. The main structural framing systems of the buildings are structural steel and/or load-bearing CMU.